PALFINGER supplies abandon and recovery (A&R) winches as part of a pipe handling/cable laying system.

Reliable Abandon and Recovery Winches for Offshore Operations

PALFINGER's abandon and recovery winches are especially designed to abandon or recover a pipe or cable at the seabed. Additionally, these winches  automatically maintain a constant tension on the pipe during pipe laying or cable laying operations. The top tension required increases in proportion to the depth of the water. Ultimately, an increased abandon and recovery winch cable length as well as tensioner capacity are required.

PALFINGER
Features

Features

  • Electric or hydraulic drive
  • Steel wire drum
  • Rated pull from 50–300 metric tons
  • Local and remote control
  • Spooling device
  • Drum guard
Options

Options

  • Active heave compensated (AHC)
  • Wire sheaves
  • Overboarding sheaves

Global Service Competence

Solutions you can rely on

PALFINGER provides complete marine service solutions to keep your deck equipment and lifesaving appliances performing at their best. With our global network of over 300 specially trained engineers, we deliver inspections, maintenance, refurbishments, and upgrades – plus spare parts for PALFINGER and OEM equipment, efficient repairs, and expert training programs. Our team ensures reliability, safety, and performance to keep your fleet running smoothly.

 

Service excellence at a glance:

  • Inspection and Maintenance
  • Refurbishments and Upgrades
  • Spare Parts and Repair
  • Agreements
  • Training
  • Industrial Services | Rope Access
  • Hook Replacement

 

Find Your Regional Contact

Choose the right point of contact for your region.